Rebuilding Network Infrastructure for 24/7 Manufacturing Uptime

A full network infrastructure overhaul for a manufacturing enterprise running continuous production lines across three facilities.

Rebuilding Network Infrastructure for 24/7 Manufacturing Uptime

60%

Downtime Reduction

3

Facilities Connected

8min

Incident Response Time

The Challenge

Vantage was experiencing recurring network outages that halted production lines, costing an estimated Rs. 8 lakh per incident in lost output.

Our Solution

We designed and deployed a redundant SD-WAN architecture across all three facilities with automatic failover, combined with 24/7 proactive monitoring.

The Results

Network-related downtime dropped by 60 percent within the first quarter post-implementation, with zero unplanned production halts in six months.

"Elixir did not just upgrade our network - they understood how our production floor actually operates before recommending anything."

Vantage Manufacturing