Manufacturing
Rebuilding Network Infrastructure for 24/7 Manufacturing Uptime
A full network infrastructure overhaul for a manufacturing enterprise running continuous production lines across three facilities.
60%
Downtime Reduction
3
Facilities Connected
8min
Incident Response Time
The Challenge
Vantage was experiencing recurring network outages that halted production lines, costing an estimated Rs. 8 lakh per incident in lost output.
Our Solution
We designed and deployed a redundant SD-WAN architecture across all three facilities with automatic failover, combined with 24/7 proactive monitoring.
The Results
Network-related downtime dropped by 60 percent within the first quarter post-implementation, with zero unplanned production halts in six months.
"Elixir did not just upgrade our network - they understood how our production floor actually operates before recommending anything."
Vantage Manufacturing